• Skip to main content
  • Skip to secondary menu
  • Skip to primary sidebar
  • Skip to secondary sidebar

Building Advisor

Practical Building Advice

search icon

Search This Site

search icon
  • About Us
  • Contact Us
  • HOME
  • BUYING LAND
    • OVERVIEW
    • GETTING STARTED
    • LAND CHECKLIST
    • IS IT BUILDABLE?
    • ZONING
    • LAND REGULATIONS
    • SEPTIC SYSTEMS
    • WATER WELLS
    • SITING A HOUSE
    • SITE EVALUATION
    • QUESTIONS TO ASK WHEN BUYING LAND
    • SITE DEVELOPMENT BUDGETING
    • TYPICAL COSTS
    • REAL ESTATE AGENTS
    • MAKING AN OFFER
    • LESSONS LEARNED
  • DESIGN
    • OVERVIEW
    • PLANS & SPECS
    • SITE PLANNING
    • SITING A HOUSE
    • FLOOR PLANS
    • HIRING AN ARCHITECT
    • HIRING A DESIGNER
    • DESIGN-BUILD CONTRACTORS
  • HIRING
    • OVERVIEW
    • GETTING STARTED
    • TASKS & PLAYERS
    • ARCHITECTS
    • DESIGNERS
    • CONTRACTORS
    • SUBCONTRACTORS
    • DESIGN-BUILD CONTRACTORS
    • CONSTRUCTION MANAGERS
    • OWNER-BUILDERS
    • REAL ESTATE AGENTS
  • ESTIMATING
    • OVERVIEW
    • COST OVERRUNS
    • PRELIMINARY BUDGETING
    • BALLPARK ESTIMATES
    • PRICING GUIDES
    • CONTRACTOR ESTIMATES
    • OWNER-BUILDER ESTIMATES
    • REMODELING ESTIIMATES
    • STEP-BY-STEP GUIDE
    • OVERHEAD & PROFIT
    • ESTIMATING SPREADSHEET
    • ESTIMATING FAQs
  • BIDDING
    • OVERVIEW
    • PRICING THE JOB
    • FIXED-PRICE BIDS
    • COST-PLUS BIDS
    • DESIGN-BUILD BIDS
    • NEGOTIATED BIDS
  • CONTRACTS
    • OVERVIEW
    • CONTRACT BASICS
    • CRITICAL CLAUSES
    • STANDARD CONTRACTS
    • MODEL CONTRACT
    • SIMPLE PROPOSALS
    • WRITTEN SPECS
    • ALLOWANCES
    • CHANGE ORDERS
    • DOCUMENTATION
    • DISPUTE RESOLUTION
  • FINANCE
    • OVERVIEW
    • WHAT’S YOUR BUDGET?
    • GETTING BIDS
    • OVERHEAD & PROFIT
    • CONSTRUCTION LOANS
    • DOWN PAYMENTS
    • DRAW SCHEDULES
    • ALLOWANCES
    • CHANGE ORDERS
    • LIEN WAVERS
    • THE FINAL CHECK
  •   
  • WELLS
    • OVERVIEW
    • WELL DRILLING
    • FROM WELL TO TAP
    • WATER QUALITY
    • WATER TREATMENT
  • SEPTIC
    • OVERVIEW
    • HOW IT WORKS
    • PERC TESTING
    • ALTERNATIVE SEPTIC SYSTEMS
    • SEPTIC SYSTEM MAINTENANCE
    • SEPTIC SYSTEM FAQs
  • FOUNDATIONS
    • OVERVIEW
    • DRY BASEMENT DETAILS
    • SITE DRAINAGE
    • WATERPROOFING
    • BASEMENT INSULATION
    • CRAWLSPACES
    • SITE EVALUATION
    • SITING A HOUSE
  • EXTERIORS
    • OVERVIEW
    • ALL EXTERIORS LEAK
    • RAIN-SCREEN WALLS
    • SHEATHING WRAP
    • WINDOW FLASHING
    • WALL FLASHING
    • FLASHING MEMBRANES
    • METAL FLASHINGS
    • PAINTING & STAINING
  • DECKS
    • OVERVIEW
    • STRUCTURAL DETAILS
    • FRAMING MATERIALS
    • DECK RAILINGS
    • WOOD DECKING
    • COMPOSITE DECKING
    • DECK STAINS & FINISHES
    • FASTENERS & CONNECTORS
  • FREE FORMS
    • FORMS INDEX
  • BUILDING FAQ’S
    • BROWSE Q&A’s
    • Q&A INDEX
You are here: Home / MANAGE YOUR PROJECT / ESTIMATING OVERVIEW / PRELIMINARY BUDGETING

PRELIMINARY BUDGETING

In This Article
Design to Your Budget
Cost-Cutting Strategies
Build for Expansion
Scale Back the Design                 View all ESTIMATING articles

Your lender, your bank account, and, if you’re lucky, a rich uncle can tell you how much you can spend on a building project. How much you can build for X dollars sounds like a simple enough question, but rarely is.

DESIGN TO YOUR BUDGET

It is important to start with a realistic budget, whether you are designing the project yourself or working with a professional designer. I recommend that you start with your own rough estimate for the size and type of project you have in mind  before you start a detailed design. It’s best to use multiple approaches for ballpark estimates. Throw them all in a pot, stir, and you’ll come up with a good “guesstimate.”  This number is a good starting place for establishing what you can build.

If you are working with a professional designer, share your budget numbers with the designer or architect so they can start off working in the realm of the possible. Find a designer familiar with residential construction costs, and make it clear that you cannot exceed X dollars in total project costs. With clear budget guidelines, you will reduce your chances of getting a design that is so over budget that it will never get built. Unfortunately, this is the fate of many ambitious designs.

Even with clear budget guidelines, many architecturally designed projects come in over budget, sometimes by as much as 50%, when put out to bid. In my experience, many architects are overly optimistic when it comes to estimating. Few have the hands-on construction experience and estimating skills of a contractor. Also, by training and temperament, they are more motivated to create the perfect space in form and function, than to make it affordable. A design-build contractor may be a better choice for designing withing a specific budget.



COST-CUTTING STRATEGIES

If your find that your preliminary plans are significantly over budget, you’ll need to cut costs (or find more money). You can

  • Scale back the size of your project.
  • Choose less expensive windows, doors, cabinets, flooring, siding, and other finishes.
  • Cut out luxury items such as jetted tubs or granite counters.
  • Hold off on the deck, porch, garage, or other components that can be added later.
  • Leave parts of the building such as basements and attics ready to finish later.
  • Create an expandable design that is easy to add to later.
  • Depending on your skills and time, do some of the finish work yourself such as interior trim, painting, and landscaping.

BUILD FOR EXPANSION
There are easy, low-cost steps you can take during design and construction that will make it easy to add on later or to finish additional space already built – for example, run rough wiring and plumbing into an unfinished attic or basement for completing later. Or frame the openings for future doors into an addition, porch, or garage, and bury the pipe and wire runs you’ll need later (and remember to keep a set of plans that show where the openings are).

SCALE BACK THE DESIGN

If, despite your best efforts, you end up with a completed design that is drastically over budget, you may end up paying for a design that never gets built. Hopefully, you can salvage it. Sometimes, the design is quickly, and perhaps crudely, scaled back — often by the contractor who informs you that the project cannot be built within your budget. Assuming the builder has a decent eye for design, the project may come out OK, but it would have made a lot more sense to design something affordable in the first place – or to just pay the architect for the conceptual or  schematic design, and let you and the builder work out the details.

See also:  What’s Your Budget?          Why Jobs Come in Over Budget

Back to Top



Reader Interactions

Comments

  1. Ron says

    January 7, 2020 at 11:04 pm

    Budgeting For 2-Family

    What do I need to consider in coming up with a realistic budget for building a duplex?

    Reply
    • buildingadvisor says

      January 7, 2020 at 11:16 pm

      There are obviously a lot of variables here that need to be considered in budgeting for a project of this scope.

      Are you buying the land? Undeveloped (vacant) land or developed lots in a subdivision? The costs of getting vacant land ready to build on are sometimes grossly underestimated by people unfamiliar with the process.

      What should you budget for soft costs: design, engineering, permitting, utility and other fees, inspection, legal, and finance, and other costs of doing business?

      What should you budget for hard costs, sometimes called “sticks and bricks”. This is the price you will be paying a contractor to complete the project. Your square-foot costs can vary a lot depending on whether you are in low- or high-cost market, your building design, and the quality level of your finishes. For example, Are you using vinyl or ceramic tile in your kitchens and baths. Are you building a basic box or an architectural masterpiece? You can spend under $100 per square foot or over $200.

      What other costs can you expect to incur after the contract is complete? Landscaping, appliances, window treatments, and other finishing touches can add up quickly.

      Here are a few articles to get you started.  If you feel like you are over your head, you might want to hire a professional estimator to help you develop a realistic budget.

      Site Development Budgeting
      Site Development Costs
      Estimating Errors & Cost Overruns
      Ballpark Estimates
      Unit-Pricing Guides
      How Contractors Estimate

      Reply
  2. Brenda Intini says

    October 15, 2016 at 11:09 am

    Cost to Build Up vs. Build Out

    I am adding an inlaw suite. Is it more cost efficient to add a second story to my bungalow, or to build new on beside?

    Reply
    • buildingadvisor says

      October 16, 2016 at 12:23 pm

      There are many factors to consider and each project is unique, but in general it is cheaper to add a ground-floor addition than to build up. Exceptions would be:

      • if you have a roof that is high enough and steep enough to add living space with one or more dormers
      • if you can add space over the garage

      Building up usually requires more extensive changes to the existing interior to make room for a new stairway. Finding space for a stairway in your existing floor plan can also be a challenge. Building up vs. out will require more disruption to the existing house for plumbing and heating, and may require structural changes to the framing and foundation to handle the greater load. In addition, you will need to remove the roof at some point, causing disruptions to your home (you may need to move out for a while) and exposing your house to potential damage.

      Building out is usually easier from a design standpoint as you are starting with new space and do not need to fit in a stairway, which takes a lot more space than most people realize. When building out, you can often use an existing doorway or convert a window to a door with minimal disruption. Foundations for additions are usually pretty straightforward, using a slab or crawlspace depending on local conditions.

      One downside of building out is that you will lose yard space, and may also lose some windows reducing ventilation and daylighting. You may run into issues with zoning regulations if you need to build closer to the property line than allowed by “setback” rules. Zoning also limits the “lot coverage,” that is, how much of your lot is taken up by structures and pavement.

      Zoning also imposes height restrictions, but adding a second story to a bungalow should not be a problem. In any case, you should check with your local zoning official about local regulations before getting to far with your planning.

      In new construction, however, the opposite is true: it’s generally cheaper to add space with a second floor than to spread out with a single-story home.

      Best of luck with your expansion plans!

      Reply

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

Primary Sidebar

Visit Inspectapedia.com our Sister Site

Secondary Sidebar

 

ESTIMATING SPREADSHEET SPECIAL

Only $19.95 for Lifetime License LEARN MORE



Share this article

Recent Posts

  • Best Approach to Hot-Climate Cathedral Ceiling
  • Frost-Protected Shallow Foundations
  • Patios & Decks for Coastal Homes
  • Can I Foam Basement Wall With Existing Studs?
  • Is Top Railing On Deck Code-Approved?

Copyright © 2025 · Magazine Pro for Building Advisor on Genesis Framework · WordPress · Log in